+86 136 3238 5668 Reply within 10 working hours
EN Request a Quote

Applications · 1 min read

A preventive maintenance schedule for air shafts

Weekly pressure check, monthly seal and lug inspection, quarterly runout check, yearly rebuild of heavily used shafts.

Short answer:Most failures give warning. A simple weekly / monthly / quarterly / yearly routine catches them before the line stops.

Weekly

  • Check pressure and listen for leaks
  • Look for core marks

Monthly

  • Inspect valve and seals
  • Check lug movement and wear
  • Clean the air inlet

Quarterly

  • Measure runout with a dial gauge
  • Inspect shaft ends and bearing seats

Yearly

  • Replace worn pneumatic parts
  • Rebuild heavily used shafts
  • Review spares stock

Record it

Keep a simple log per shaft: date, pressure, findings, parts replaced. It turns maintenance from guesswork into history.

FAQ

How often should seals be replaced?

Inspect monthly; replace when hard or damaged.

Do you supply a checklist?

Yes, on request with a spare-parts order.

What is the most common failure?

Pressure loss from bladder or valve.

BT
Written by the Benteng engineering team.
We build air expanding shafts in Guangzhou and answer drawing questions daily. Talk to an engineer →

Send a drawing. Get a real answer.

An engineer-reviewed quote within 24 hours, with tolerances and lead time included.

WhatsApp Send Drawing