
Tolerances you can measure.
Every shaft is checked for OD and runout, and the inspection record ships with it — not just "high precision" on a brochure.
Guangzhou · Air shaft factory
Lug, segment and continuous strip shafts from 1" to 12", with OD tolerance ±0.05 mm and runout ≤0.1 mm. Six processes under one roof in Guangzhou.
Reply within 10 working hours · Your drawing stays confidential
Pick the wrong one and you get slipping cores, telescoping rolls or slow roll changes. Switch below to see how each one grips.
SEGMENT
LUG
STRIP
3" · LUG
Air pressure pushes independent lugs outward until they lock the core. Highest grip of the three, and a worn lug can be replaced on its own.

Every shaft is checked for OD and runout, and the inspection record ships with it — not just "high precision" on a brochure.

Cutting, turning, grinding, keyway milling, assembly and pressure testing happen in our own workshop. No subcontracting.

Bladders, valves, lugs and shaft ends are available separately, so a leak doesn't mean a new shaft.

Send a DWG, PDF or even a hand sketch. We confirm the six critical dimensions and quote within 24 hours.
Click a symptom to see which part fails. We supply all four, matched to your measurements before shipping.
Common 3", 6" and 8" sizes available. No online checkout — we confirm the match first.
Click a step — or let it play. Six processes, none of them subcontracted.
Ask for a progress update at any stage — we can tell you which process your shaft is in.
STEP 01 / 06
01 / CUTTING — tube cut to length, checked for roundness
Slitting machinesRewind under high tension
Laminating & coatingConsistent web tension
PrintingFlexo & gravure presses
Bag makingFast roll changes
Paper & tissueRewinders and slitters
Nonwovens & filmThin webs, no drift
Not listed? Tell us the machine and web width — we'll match the shaft. Ask an engineer →
CALIPER · OD CHECK
Every shaft ships with an inspection record. Ask for a sample record before you order.
DWG, PDF or a hand sketch — anything with dimensions.
We check the six critical items and ask for what's missing.
Structure, size, quantity — within 24 hours.
Locked once production starts.
Inspection record included; packing photos before dispatch.
Practical notes on measuring, choosing, repairing and importing air shafts.
4 MINCore ID, face length, valve thread — two minutes with a caliper.
Read the guide →
6 MINWhich structure fits your web, tension and changeover time.
Read the guide →
7 MINFive of the six are fixed by replacing a part, not the shaft.
Read the guide →
5 MINRewind tension, roll changes and the structure that suits each.
Read the guide →
5 MINWhy the number matters, and how to check it when the shaft arrives.
Read the guide →
6 MINFour steps, one photo check, and a pressure test before you run.
Read the guide →One new article every week — measuring, structures, failure modes and applications.
Browse all articlesNot a catalog and not a "contact us for price" loop — an engineer-reviewed quote within 24 hours, with tolerances, lead time and packing details included.
No account needed. No online checkout. Just a reply from an engineer.