Applications · 1 min read
A preventive maintenance schedule for air shafts
Weekly pressure check, monthly seal and lug inspection, quarterly runout check, yearly rebuild of heavily used shafts.
Short answer:Most failures give warning. A simple weekly / monthly / quarterly / yearly routine catches them before the line stops.
Weekly
- Check pressure and listen for leaks
- Look for core marks
Monthly
- Inspect valve and seals
- Check lug movement and wear
- Clean the air inlet
Quarterly
- Measure runout with a dial gauge
- Inspect shaft ends and bearing seats
Yearly
- Replace worn pneumatic parts
- Rebuild heavily used shafts
- Review spares stock
Record it
Keep a simple log per shaft: date, pressure, findings, parts replaced. It turns maintenance from guesswork into history.
FAQ
How often should seals be replaced?
Inspect monthly; replace when hard or damaged.
Do you supply a checklist?
Yes, on request with a spare-parts order.
What is the most common failure?
Pressure loss from bladder or valve.
Send a drawing. Get a real answer.
An engineer-reviewed quote within 24 hours, with tolerances and lead time included.